Monday, November 27, 2006

Weekend Recap

As previously reported, Steve installed the stairway railing this weekend. Nothing fancy, but we improved on what was there in that he made the railing in two pieces instead of four (what was there) and we used all oak rather than a mix of pine and oak. And we used better hardware.



Unfortunately the metal angles Steve was planning to also use to reinforce the connection on the angles did not want to cooperate. Suffice it to say, there was some cursing and crabbiness and ultimately the railing went up without them. At one point I said to Steve, "Can you lower your standards maybe a little?"



And here is Steve buffing out the grout haze. This buffing pad worked but it was still a tiring job.



While Steve was fighting with the railing on Friday, I was busy on my holiday decorations. It was about 60 degrees outside and I thought that was a good time to be outside stringing some lights. It's hard to get a good photo though.

I love the oversize more old fashioned bulbs. I used to be an all white light gal, but not anymore.



And what do dogs do on Thanksgiving? Why, they sit and wait for the turkey to be done of course.

Saturday, November 25, 2006

Closure

I have been somewhat remiss on blogging lately. It's probably due to the change in seasons and having such an all-involving project as the 2nd floor winding down to completion. Believe it or not, we still have a few things to do up there.

Steve installed the stairway railing this weekend and it was a real bear of a project. We used a drill attachment with a buffing pad to buff the grout haze off the bathroom tile. One of those things our contractor should have done, but we didn't notice it until he was gone. It was kind of a "rats!" moment when we realized that and as you can see we procrastinated it for a while.

I worked on cleaning up the basement more and various small and sundry tasks. All that remains to be done upstairs is to clean and wax the bathroom floor and replace the broken mirror in the medicine cabinet. Oh, and we still need to break down the drying rack in the garage.

It's amazing how many little things we had on our punch list. Everything from polyurethaning window sills and shelving to caulking the holes around the radiator pipes to installing a paper towel holder to installing a dimmer switch and on and on. Steve kept adding to it. He's really a perfectionist and he sometimes suffers for it. I know he's really glad to be done with this project. I was over it 3 weeks ago!

Anyway, I have some great news to report and that is that we have found our tenants and they signed the lease on Tuesday! They will be moving in mid-December. They really seem to appreciate the apartment and we are hoping it will work out well. I have a good feeling and I suspect that karma-wise we are due for a better experience than the last one.

A belated Happy Thanksgiving to you all!

Monday, November 20, 2006

Angie's List Membership Pays Off


Not only were we able to source some good contractors through the list, but I submitted 15+ reports in October and qualified for a free camera!

Since I already have a digital camera, I'm planning to gift this one for x-mas. One less gift to buy and to think home improvement paid for it!

Now if only I would win that Plasma TV they are giving away... I really think I deserve it big time don't you?

On another note, my review of Chicago Woodstripping was featured in their monthly email newsletter.

Description of Work:
We hired Darrell to strip 100 years accumulation of paint off 1800 linear feet of wood trim from the 2nd floor of our 2-flat as well as 3 window frames and 9 two panel oak doors.

Member Comments: We were extremely happy with the job Darrell did. His price was reasonable and he finished this tedious and time consuming work on time for our project. In fact, we were so pleased with the job, we gave him a $300 bonus when he was done. All of the wood had not one speck of paint on it when returned. Due to dip stripping (the method he uses) we did have some boards get a bit warped and some joints on doors were loosened, but this is to be expected with this method. He will also strip wood in place in your home as well. Darrell is a good guy and he is doing a huge service by helping save old architectural elements from the garbage heap! Perhaps best of all, we were able to put back the original coffered ceiling beams (see photo).

So, overall we are happy with Angie's List. We didn't get any BAD contractors off the site. Things were not perfect with all of the one's we hired, and we won't rehire some of them, but overall we did pretty well. I'm going to add them as a resource on my sidebar, because we really do use them and I've shared information with others successfully as well.

Sunday, November 19, 2006

Getting Back to Normal


At the end of May, we moved Steve's office from the basement to our dining room for the post replacement. Truth be told, I never liked him working down there. We have asbestos piping still and I felt relieved having him out of there.

The dining room got even more cluttered when we moved everything out of our den (for gutting) and into it as well. It was one of those cases where you kind of have a pathway through a room and no longer have a room. It was kind of embarrassing to me so I never posted a photo of the mess. The picture here was taken on a good day, when our dining room table was clear of any clutter.

This weekend we got our dining room back. We kind of need it for Thanksgiving, it was just in time. The table in the corner is only a temporary side table for Thanksgiving. We had to keep my desk there also because of limited space in the den. Eventually, we are hoping to build a longer desk in the den and fit my workstation there also. Or maybe I'll get a laptop and we won't need this desk anymore!

We moved Steve's office into the den. We still need to install picture molding and hang pictures in there and some of the furniture etc... is only temporary, but it's not too bad for a temporary solution.


Things feel alot more organized now and I'm breathing easier.

Thursday, November 16, 2006

Update on 2nd floor etc...


Last weekend, Steve & I worked on installing the stairwell railing. He used manual Jorgenson miter saw to cut the angles. And he installed the hardware. He stained it today and will poly the railing tomorrow.

I cleaned the front entry floor(see left) with an abrasive disc attachment on a drill and Comet. I got up the stains and paint residue, but I didn't want it too clean. After all, it's 100 years old and it shouldn't look brand new.

The only trick to this project was that I had to paper off all the walls and doors because the stuff splatters everywhere.

We also showed the apartment to a couple of youngsters and they absolutely loved it. It's a guy and girl and they've been friends since high school and now are out of college and 23 years old and moving to the city from the burbs.

I had my "quiet building" talk with them and told them some about some of our previous tenants bad behavior. Their eyes got very wide and they were sympathetic. They said they are computer nerds and the only noise they might make would be video games and they would turn them down if asked. I liked them.

We were trying to avoid younger people because they can be more loud we think, but they seem okay and we are willing to give them a try.

They haven't signed a lease yet, but probably will soon. I will be so relieved to have this task accomplished and am hoping for the best.

Friday, November 10, 2006

On living in a two-flat


The whole experience of renovating the 2nd floor has been an interesting one. While some are drained of all energy during a remodeling project, others are energized and inspired. We, for the most part, fall into the energized category.

Something about making a vision come true motivates me. And I've learned that I really enjoy working with my hands and working with wood. I didn't really know this about myself until this summer.

The whole idea behind remodeling the 2nd floor was so we could attract a better tenant- not so we could move upstairs. Of course, seeing it look so lovely makes me want to live in it, but I can't live in the whole building. We need the rental to help with the mortgage. These are the facts of our life.



The comments I've gotten about this project have made me think about what it means (or can mean) to live in a 2-flat. I've mentioned before that my childhood home was a 2-flat (see b/w photo) on a block that reminds me alot of Aaron & Jeannie's- very neighborhoody and filled with kids my little sister and I played with outside all summer long. Our one block seemed like a mile to us. So much took place there. So many games of Statues, Dracula, War, visits to "The Jungle", which was the overgrown area between our building and the one next store. It all took place on Washtenaw.

One summer, we deforested "The Jungle" to grow a vegetable garden. Boys came and trampled our lettuce, but we perservered. It was too shady really to grow much but hostas or ferns in there, but it makes a nice memory.

We had a family that lived in the 2nd floor and their son Max was a good friend. He was a daredevil kind of boy who threw himself off the 2nd floor porch into a snow bank thinking it would be neat to jump into a bank of snow and broke his arm in the process. I think he put his head through a glass window at least twice. Like I said, he was a wild one. He had the world's best scream too. I can still remember it.

We loved him and his parents Margaret & Tom. Margaret grew vegetables in the back yard and was a vegetarian. We used to sneak Max our forbidden candy. They made some noise, but it never bothered us. It was pretty harmonius that I remember. Perhaps because I had such a happy childhood in our 2-flat, I feel so at home in ours.

I'd like to create that situation here. Call me an idealist (I've been called this before), but I'm putting it out there. We're trying to create a nice place in our building and in our community too.

We learned an important lesson with our last tenants. That is is better to wait for the right tenant, then just take the first available. In the end, it will cost us less money because the apartment will be better cared for and it will most certainly bring us less headaches.

And quite frankly, I do believe we can make our dreams come true. I'm seeing it happen all over houseblogs every day- step by step by step!

Tuesday, November 07, 2006

Bare Naked Wood

Okay, now bring on the weird google search results! I'm really tempting fate with this post name.

Anyway, I thought I'd post what I've been up to lately. I actually got a chance to finish the closet doors in our den and bedroom.

Here you see the room and door pre-stripping and refinishing.


And here it is after.



And here's the bedroom pre-refinishing. We still have that lone light bulb for a ceiling fixture. But, I ordered a new ceiling fixture from our friends at Rejuvenation. In a few weeks we'll have it. It's funny how much that bare light bulb doesn't bother me- really funny. It's amazing how accustomed I am to having unfinished things around me.



Here's the door refinished. The only trim in the entire building that has not been stripped is in this room. Unless we buy another building and start over (NEVER), my stripping life will be coming to an end soon. No more woman stripping here at the 2-flat.

How many of you are near finishing your stripping careers? Are you wistful? Glad to be finished? Ready to buy and start anew? Do tell!

Sunday, November 05, 2006

Medicine Cabinet & Bathroom


It's been a long time coming, but Steve finally has the medicine cabinet installed. As you can see from the photos, the mirror cracked while Steve was putting it in, so we have to go get another one today.

Just another example of how nothing ever goes perfectly- or very rarely anyway. But that's okay, we're in synch with that really!



I think it turned out beautifully. This piece is made with 5/4 (1 & 1/16") rift sawn oak, which has a straighter grain than plain sawn lumber. The design mimics the existing woodwork throughour the house. He even used a spare crown piece for the cap. The door is made with mortise and tenon construction. To save time, the frame was screwed together.

The hinges are Japanese butterfly hinges and are nickel plated. He could not get the hinges he really wanted (traditional nickel plated ball-type hinges) because they were out of stock. The Japanese butterfly hinges do not have a pin that is removed and they just lift right off.



Here is the inside. He used 3/8" beveled tempered glass. It is not cheap either, but it looks nice and is quite sturdy.



Here's a photo of the bathroom pre-renovation. The tile was in especially bad shape as you can see in the next photo.

Saturday, November 04, 2006

Last Call for Gardening

Today was fairly mild and so I decided to dig up my canna bulbs for the season. It had been unseasonable cold and so all the foliage had pretty much died, so it was time. These plants are so very prolific- I always end up with more bulbs to give away in the Spring.

I've posted about planting the cannas in Spring, so I thought I'd cover the end of season work too. They are great plants that produce lots of nice foliage and flowers, but they do require some work. They have to be planted and dug up every spring and fall and they like an inch of water a week and fertilizer a few times a season. I used Miracle Grow and that seems to satisfy them. Oh, and they like full sun.

They are definitely a Chicago plant even though they are semi-tropical. The spectacular display makes them worth the effort for many people I guess. I look at it this way, it gives me something to do in the yard when most of the gardening is over.

Here's the process. Take a pruner or lopping shears and cut the foliage down to about 6 inches. This gives you a "handle" to pick up the rhizome.

Then, of course, you dig them up and carefully break apart the rhizomes. They tend to clump.


Here is some of the dead foliage. It's very lush and green when alive and it looks like wilted collard greens when dying.

And here is a rhizome, fresh out of the ground. I think I dug up about 50 of these and I only planted maybe half that!

Tuesday, October 31, 2006

Old House Horrors

Besides the occasional haunted house, there are some pretty scary things we old house rehabbers have to deal with right? And, no I'm not talking about the bills this time.

In honor of Halloween, I thought I'd post some of the scariest things in our building. Of course they are all in the scary basement now since we've renovated almost everything else. The back porch should really be on the list because, well, because it's very old and it starting to separate itself from the building. I can't help but think of my mortality when I'm on it- especially on the 2nd floor.



Then, of course, we have the area of our basement that I like to call our own personal Blair Witch project. Otherwise known as...the crawl space under the back porch.


Go on, I dare you, Crawl around in there and see what's up. I think C.H.U.D. lives there. And yes, I did see that movie (in the theater!).



Of course the most terrifying would be anything that is a serious threat to our health and safety. I'd say the crumbling asbestos insulation in the basement more than qualifies in this regard. (Don't worry- we never ever touch it- except when I accidentally bump my head on it a few times a year)



This one looks like something from Star Wars. Can you hear it? It's saying "Danger Danger Will Robinson!! Danger!!" Now....I hope you'll share the scariest things in your home so I can rationalize how not bad mine are- won't you please?

Happy "Old House Horrors" Halloween from Chicago 2-flat!

Saturday, October 28, 2006

It's a keeper


Without further ado, behold the iron railing. It's been such a long time coming, and it went up so easily (we did not install it so easy for me to say), it's almost anti-climactic.

We like it. We think we'll keep it.

And for those of you who missed the saga of the iron railing, or those who care to take a stroll down memory lane, let's do a recap.



We started our journey with a desire to get rid of the tacked on panel on the front of our building. We suspected that at some point, the original french doors were removed so the space above the entry could become a small third bedroom.



Here you see a view from inside the small room before demolition.



And as you can see, that view has changed.



Here is a close up of the railing. It is very true to Steve's drawing. Three coats of Sherwin Williams Industrial and Marine Coating in Black later, it looks more wrought-iron-esque than when just primed.



This is going to sound like bragging, but our welder told us that a customer came in and saw our railing in his shop and said, "I want a railing exactly like that one." Damn. We really should have copyrighted that design.

And we have a few more things planned for the front of the building. In the Spring, we plan to put in a nice cloth awning.
And eventually, Steve plans to build double doors, which will be bringing the building back to what was originally there also.

Friday, October 27, 2006

Review: Pratt and Lambert Varnish


We used Pratt and Lambert 38 Clear Varnish in Dull for all the window sills and shelves on the 2nd floor. This included the pantry shelving and all the shelves in the closets.

I applied one coat, waited a day, sanded lightly with 200 grit sandpaper, wiped the area clean, and then applied a 2nd coat. While it feels like there is a coating, it doesn't look like it. There is no shine. We are pretty much anti-shiny when it comes to wood at our house so we are very happy with this product.

As you well know, we like to feel our wood. Nothing can separate us from the feel of oak under our fingers- nothing! As a result, all the furniture Steve makes is treated with linseed oil and then fumed, and it doesn't have a surface that is difficult to repair like a high gloss finish would be.

Steve used the same varnish for the medicine cabinet this week only he applied the maximum of 3 coats.

It's still dull, so we are happy. We like things dull.


But tomorrow, get ready for some excitement when the iron railing goes up.

On the tenant front, still no tenants. I'll do a separate post about that tomorrow hopefully.

Tip on polyurethane:

It's important to use the same based product over another. For example, when we poly'd our radiator covers, we used a water-based poly because the paint we were coating over was water-based. When coating over an oil-based stain, use oil based poly. Also, never shake the can or you will get the dreaded bubbles. Note the stirring stick in first photo.

Monday, October 23, 2006

Flat Roof & Parapet Story


I've posted here and there about the roof and parapet, but I never really shared the whole story. It was definitely a complex problem that we had to deal with and well worth sharing. It really illustrates how many resources there are out there for finding solutions to your home improvement problems.

We had our flat roof torn off in June. This uncovered a our very deteriorated parapet wall. Our roofing company said, "Just cover it up- no one will ever see it." They were going to put our new rubber roof right over it and bury the problem. We were not so sure this was the right move.

First we called up the mason that had just finished tuckpointing our building to ask his opinion. He said "If the roofing company says it's okay, I wouldn't worry about it." We didn't trust his judgement, so we called up a Mason we found on our Angie's list to come out and take a look. A salesperson came over and said the entire parapet needed to be completely rebuilt and this would cost about $6K. Now we had 2 entirely differing opinions about what should be done. The roofing company probably wanted to just finish the job and get paid. Our original mason didn't seem to want to come back and didn't care much (We won't be hiring him again). And the new masonry company wanted a job ($$$).

Steve then went to the Masonry Association Website . He actually called them and spoke to them about our situation. They said, "It sounds like you have a bunch of charlatans on your hands. What you need to do is hire a Masonry Consultant that does not do work; they just evaluate the job and make recommendations."

Based on this discussion and the referrals they gave us, we hired Walter Laska from Masonry Technologies Inc. to come in for $300 and tell us what should be done. He came out and provided a written report, a detailed blueprint (actually a sketch) and a material list. The consultant also said that our parapet wall was one of the worst he had ever seen condition-wise (deteriorated mortar joints, spalled brick etc...). This confirmed our gut reaction to seeing the wall and our hesitation in covering it up.

Shortly thereafter, we went to a our Masonry Supply store and purchased all the materials needed, which included Chicago common brick, different types of mortar, flashing, roof caulking, and much more.

Steve spent evenings and weekends grinding out the deteriorated joints. It kept raining, which delayed the work repeatedly. We also were living with a temporary base sheet that the roofing company put on, which is not a real roof and no gutter. It just kept raining and we kept getting more nervous about leaks and damage if this temporary roof failed. We had just renovated the 2nd floor and alot was at stake if water got in. We also were having water leaks in our enclosed back porch, which was not good for the structure.

Had we not had so many other projects going on and winter coming, we could have finished the job on time to get our roof completed for fall. (The roof job was on hold for completion until the parapet walls were rebuilt) Steve did manage to completely grind all the joints out, but alas that problem of not enough time came into play.

We were extremely fortunate that we had our contractors around (the ones who renovated the 2nd floor this summer and were still on site working) and they volunteered to help finish the job. They happen to be from Bulgaria and were laying bricks at the age of 7! According to them, lumber is scarce in Bulgaria and everything is brick, concrete and stone. They did a great job- very tidy work and with 2 guys finished the job in 2 full days. Even though we had to bring in outside help, we saved about $3K doing it this way over hiring a mason to do the entire job.



Here you see the roof tiles that run around the edge of the parapet. Steve chipped 100 years worth of tar off of every last one. I told him we have the tidiest roof in town now.

So even though this was by no means a disaster, it was quite stressful while we were figuring out what to do and living with a single asphalt base sheet layer for a roof. On windy days, I would just cringe.

Just last week the roofing company came and out the roof on. I'm sleeping much better since then especially when it rains. Now if we could just find the right tenants for the 2nd floor!

Sunday, October 22, 2006

Our Punch List is knocking us out


In case anyone thinks we've been lounging with our feet up this past week, I'm here to report otherwise. I did take a mini-break from blogging though. We've made some real headway on our final Punch List for the 2nd floor, but we still have some things left.

At left you see Steve's medicine cabinet. It needs to be varnished, and then he can install it.



We decided to accept the iron railing this week and Steve picked it up. We have gotten 2 coats of paint on it with one more to go. Our contractors will install it this coming weekend- very exciting! Here's a sneak preview.

We also had our favorite electrician come and clean up our phone wiring in the basement. There were wires all over the place and we are trying to tidy things up down there. This, of course, made me look around the basement more closely and see again all the bx wire and hodge podge electrical work down there. The basement needs ALOT of work and will be our next area of improvement. I think we will do alot of that ourselves to save money.

Monday, October 16, 2006

The return of Scrappy

He's back knawing on our pumpkin like he did last year. And imagine my surprise when I opened my back door Sunday and caught him on my stairs walnut in mouth! We both froze and stared at each other and then he scampered up the stairs. I, of course, ran to get my camera and document this infraction.

At the same time, Steve was up working on the roof parapet and so the ladder was out. I knew the 2nd floor door was closed so I wasn't too concerned about Scrappy getting inside. As I headed up the stairs I heard the sound of little squirrel feet on an aluminum ladder.

I got to the top and there he was laughing at me from above.



I feel like the greenskeeper in Caddyshack or something. Only I won't blow up our house to get Scrappy of course.

So, some of you out there have mice issues, we have Scrappy to deal with.

Saturday, October 14, 2006

The Dark Side

Sometimes it beckons. It waits until you're feeling weak and then makes it's case...

"Come on, you know you hate this house. All it ever does is Take Take Take. When is the last time you went to a movie? Remember manicures and buying shoes on a whim? Remember sleeping till 10:30am on Saturday mornings and then walking to the coffee shop up the street for a cappuccino...? Remember having time to kill?

Jocelyn You belong in a newly gutted condo. You could sell this place and pay cash for one of those. You wouldn't have to deal with tenants or maintenance...I know you really want this deep down- I can feel it. Jocelyn, the dark side is waiting for you. It's where you belong."

Me: "No, no no!!! Stop it- shut up. I love this MF house god dammit," gritting my teeth and grimacing with determination. It's true I don't love being a landlord, but this is a great investment and with a condo we wouldn't have a yard like ours or the original wood work and details. Our place says home more than any new condo could be for us. "

Dark side: "Remember what being well-rested felt like? Remember taking your dog to the lake every day for a walk? How about that social life, it's really hopping now isn't it?"

Me: "Dark side, that last part was really a low blow. I'm starting to think you are a real asshole. I'm going back to work now."

Footnote: Steve and I definitely need a break. We are almost at a spa weekend point (at least I am). This 2nd floor project has officially whooped my butt this year. Remember how I fell in love with the 2nd floor a while back? Well the romance has soured and left a bitter taste. I will be so relieved when we get tenants in there and we will not be able to work up there anymore!

Friday, October 13, 2006

The "kee" to my closet

It's funny. Sometimes I'm writing a post and I think, no one will want to read this- it's so pedestrian. And then I post, and people seem to relate and comment. Such was the case with yesterday's post about my closet.

Closets are one of those "old house" problems that many of us seem to grapple with it seems. Some of you asked how I set up the closet so that I could have a space for long items and then double bars on the other side.

The "kee" to this was our use of Kee Clamps.

Kee Clamps are industrial pipe fittings. They come in a variety of sizes and shapes for different pipe or railing configurations. Since they are industrial, they aren't the most beautiful (they are not polished) but they are incredibly heavy duty.

They are tightened together with an allen wrench. You can probably find brass versions, but I'm sure they are more expensive and let's face it, we have a humble working class 2-flat and we think kee-klamps fit right in here.


Here is a close up of the kee clamp at work. At left I have long clothes hanging. At right a double bar.


If you continue down to the floor you have a floor flange that secures the vertical bar. We used closet rod hardware (heavy duty) to secure the bar to the floor. We also bought the highest gauge steel rods we could find. We had to use a diamond blade grinder to cut it because a hack saw and a pipe cutter couldn't cut through it.

Suffice it to say, this closet ain't going anywhere anytime soon.

By the way, the company (we ordered from Fastenal) had a large minimum order for these, so we have quite a few left over. As soon as things wind down here, I plan to offer some of this up for sale on the Discussion Board or eBay. They run about $13/each.

Tonight we made one of our Home Depot marathon shopping expeditions. You know, the 3 hour kind. Among a myriad of other things, we bought some more oak for a few more shelves for my closet. My shoes need a home.

Thursday, October 12, 2006

The girl's gotta have it (a closet)


I wonder how many of us out there have lived without a closet for a period of time? I did this summer and until recently because my closet is in our den. As you may know, our den was completely gutted this summer.

My new closet may not look like much to you with grander closets- but you should have seen it before. Jam-packed with stuff and no light inside. The door had a full size shoe rack and I was constantly bumping into it and shoes would fall on my head. A real treat in the morning when you are getting dressed for work.

Living in a smaller home, you learn to maximize space and be innovative with storage. You also learn to not accumulate stuff and get rid of unneccesary stuff. I believe this is a gift.

I am trying to make my wardrobe simple and not filled with things I never wear.

The new closet has double bars, but has space for full length items on the left. Before my full length items would drape over the lower bar and become a tangled mess.



Perhaps the biggest improvement will be the shelving up top. We are going to add a shelf for a row of my shoes. I am going to have to have a little step stool to get at the top stuff. I plan to keep the floor clear for easy cleaning.

We're not entirely done as I said, we are adding another small shoe ledge and some hooks for purses etc... But I believe when we're done, I will be able to see everything I have, which is key.

Tuesday, October 10, 2006

Iron Railing Revisited


You may remember my post about the iron railing that Steve and I designed and were having custom built by a welder for our quasi-French patio doors. I posted a while back about the problems we encountered with this project.

To refresh your memory, our welder went ahead and fabricated the railing without waiting for our final measurements and specs. I just don't get how even when you tell people over and over in so many words, "I'm picky and I want this done exactly to my specifications. I will be providing you with a to scale drawing to work off of," they still go ahead and do what they want and damn the consequences.

We are experiencing a similar phenomenon with our tub refinishing company and I'll do a separate post about that.

Today, Steve drove to the south side to see the railing in person. As it turns out, the railing looks quite good. It's just quite a bit taller than we wanted. We decided on about 41 inches high and he made it 44 inches. Three inches might not seem like a lot but proportion and scale are important and it is really a shame when we had something custom made that we should have to compromise.

Funnily enough, while Steve was at the guys shop, he heard him on the phone with an attorney talking about putting a lien on someone's property for an unpaid bill. ejem.

We are going to put some masking tape along the exterior where the railing would go to try and get an idea how it will look. I am more inclined to accept it as I want a railing real bad and it looks nice. Steve is more hard line in case you hadn't figured that one out yet.