Wednesday, June 25, 2008

It'll do (a belated patio update)

I'm the first to admit that our patio is not much to look at. But at least we can use it now.

Just to give you an idea of what is involved to patch a few areas of a patio like we did, I'm going to give a little summary:

Twenty-five bags of concrete were needed for these two areas. One area was about 7' L x 2' W and the other was about 7'L x 7'W.


Steve and I made a few trips to Home Depot and Clark Devon for concrete bags as we didn't want to overburden our car with all that weight (not a good idea).

Since we didn't realize when we planned the project just how many bags it would take, we had decided to not rent a mixer and instead mix it all manually using our brute strength (free advice: Do not do this). We took turns. Steve would mix while I used the hose to add water and then the reverse. It pretty much took all day on a Saturday, but we finished in one day. And it whooped us good- we were fairly useless and cranky the rest of the weekend.

I have so many plans for our backyard and they include a new patio with stone or brick. And I've watched more than my share of "Landscaper's Challenge." But alas, they will have to wait.

Next spring we are 90% sure we will have a new fence on the north side of our yard put in (we will probably do ourselves in a few weekends) and after that I can finally plant more trees and shrubs and implement more of my landscaping plans. But for a new patio, we will probably wait until we get a new back porch.



In these parts (Chicago), a 2-story enclosed deck built to the new Chicago codes would run us about $20K- not exactly small change. (This price includes the tear down and removal of the existing back porch.)
At dinner that same Saturday night, we ate at a local place in their outdoor patio in back. We noticed they didn't have a first floor porch and that gave us the idea to just have an upper deck and only a small landing and staircase from our kitchen to the yard rather than a deck. This would enable us to have a larger patio. And a stone patio would last longer than a wood deck and need less maintenance.

We have time to plan and time to consider our options. Lack of funds gives one time to ponder. And in the meantime, we at least have a usable patio. As I said, it'll do!

Sunday, April 27, 2008

Making a Dry well

Since my last post, in which I took a sledgehammer to our uneven patio with great satisfaction, we have found out some things about our house. This is the risk you take whenever you take the plunge into demolition in an older home (or even newer homes too sometimes). In this case it was nothing dire or shocking, but one of those things that made us readjust our plans slightly.


When we excavated the area near our gutter (our building only has one gutter), we found that a dry well was constructed underneath our porch, which is where all of the water from the gutter ends up- right-next-to-our-house. Water, of course, is not something you want near your home -at all.


Steve started doing some research on the internet trying to figure out what we should do about this, and found that a dry well should be a minimum of 10 feet from the home- ours is about 3 feet, except it is under our porch, so in a way, it's kind of right underneath a part of our house.


He also did research on rain barrels, which I would love to have, but there are a few obstacles.

1. For a 1/2" rain on a 1000 square foot roof, 200 gallons of rain water is generated. Most rain barrels are 55-80 gallons. We would need two or more and that would take up alot of space on our small patio. We could do one barrel and then have an overflow that goes somewhere else. Or add another gutter. All projects we are not up for right now.

2. In our cold Chicago climate, the rain barrels would need to be disconnected in the winter as with all the freezing and thawing, they would surely crack. This means that we would have to have a backup drainage system for that part of the year.


We determined that because we are not up for relocating our dry well right now, we will not be doing rain barrels. But maybe we will at some point. I really would like to.


My feeling is that if it's been okay this way for 100 years, a few more years won't kill us (or the house). We are fortunate in that we pretty much live on sand and so have excellent drainage, which may be why this location was thought a fine spot in the first place.

How has this changed our plans for our patio repair?
Well, we have decided that we don't want to pour concrete over something that will relatively soon need to be excavated and corrected and so we have opted to rebuild the dry well (it needs it!) and place 12" square concrete tiles over that area. This way, we are not cementing in something that will be removed in a few years.

Our patio will be a bit hodge-podge, but at least it will be one level and I can camouflage it with beautiful containers strategically placed. And it will be much more functional. So without further ado, here is what we have accomplished thus far with our patio and refreshed dry well.


We were pleasantly surprised to discover the foundation for our porch has a limestone footing and several courses of brick.

In this photo you can see the gravel bed that we laid to prevent the sandy soil from washing away underneath. We also laid bricks and chunks of excavated concrete in the bed to help secure the drainage pipe not pictured).

What is Steve doing with those dreadlocks you might ask? This are actually something called yoakum rope and it's used to seal the pipes like a kind of caulking. So many things to learn about. I googled "yoakum" and I can't find anything on it. I guess there are some things you can't find on the internet, but I find that hard to believe. Anyway, thanks to this post, now there is some info on this bizarre product.


After rebuilding the dry well, we leveled the soil and put another layer of gravel, which will help support the concrete tiles. We have to add more gravel and playsand and then the tiles will go in.

And then we have that strip to patch with concrete.

I am actually really pleased that we will have this all done in the next few weeks and be able to enjoy our patio this year. It's no showplace, but it will work for us until we undertake the big project of rebuilding the back porch and laying a new patio. And just fyi, building a back porch is a job we would hire others to do. We aren't that crazy. Laying a patio,that we would do. But just this morning after yesterday's backbreaking work, Steve said that if we ever do a whole patio job, we will budget in weekly massages on Sundays. Sounds like a good idea to me!

Wednesday, April 09, 2008

My First Sledgehammer

I tried it out on Sunday. I must say, I'm better with a sledgehammer than a hammer. Steve is better with tools in general- he has more experience. But I've held my own with a Sawzall. It's always easier to destroy something than create it in the first place.

I finally excavated the old concrete slab that we believe at some point was a landing base for back porch stairs. No longer serving that purpose, all it did for us was make the patio space less useful and give something to trip over every now and then.



Now it's been cleared and is ready for new concrete. We are just doing a patch job on the patio for now.

Check out the gutter drain pipe which goes to a catch basin underneath our porch. That catch basin is kind of a mess and before we close the patio up again, we are going to excavate what is in there. Woo hoo!- looking forward to that one.





As you can see our patio needs help. Last summer, we lived with that missing strip all season. Having a complete patio will pretty much be nirvana for us.